1 year
College Street Toronto: before and after Absolutely transformational. So so so proud of @TO_Cycling_Ped . #biketo #walkto (videos aren’t of the same block, but College St b/w Spadina and Manning will all look like the after condition soon!)
37
100
845
@BeckyKatz96
Becky Katz
3 months
Forever just trying to design bike lanes that I can ride side by side with my favourite person.
Tweet media one
@observinthecity
Observing The City
3 months
What can we learn from this? We don’t need years-long consultation processes before initial rapid deployment of lanes. Get the cheap, quick, win. Prove the usage, then adjust and harden the infrastructure when there is a chance to bundle it with other road works. Repeat.
5
47
369
17
66
761
@BeckyKatz96
Becky Katz
2 months
Bloor/St George is open ahead of schedule, so I swung by to see how it’s going. My heart is full. What an accomplishment by @TO_Cycling_Ped . #biketo
@cityoftoronto
City of Toronto
2 months
#TrafficUpdateTO   The intersection of Bloor & St. George has reopened, ahead of schedule. City staff and crews worked hard to minimize impacts to traffic. We now have a safer, more efficient intersection.
Tweet media one
22
27
241
24
47
454
@BeckyKatz96
Becky Katz
3 months
A protected intersection is born at Bloor and St George. #biketo
Tweet media one
Tweet media two
Tweet media three
16
24
440
@BeckyKatz96
Becky Katz
3 months
Let’s goooo! #biketo
18
32
402
@BeckyKatz96
Becky Katz
1 year
I happened to be in the area, so I stopped to see the College Street #biketo upgrade project. Overall, I am very happy with the results. The wide bikeway leaves room for passing or side by side riding and the bevel curb b/w the sidewalk and the bikeway enhances accessibility.
Tweet media one
32
37
380
@BeckyKatz96
Becky Katz
1 year
Bloor Street Before and After… well technically during. I am just loving the progress on the project. #biketo
13
31
360
@BeckyKatz96
Becky Katz
1 month
My favourite version of a double-double.
@jfrheault
Jean-François Rheault
1 month
Double bidirectionnelle !!!
Tweet media one
21
12
140
1
15
291
@BeckyKatz96
Becky Katz
2 years
@TO_Cycling ⁩’s newest addition. Thank you Fleet Services and ⁦ @CurbsideCycle ⁩ for helping us reduce our reliance on gas powered vehicles for construction, larger public meetings, etc.
Tweet media one
18
30
280
@BeckyKatz96
Becky Katz
1 year
Bit by bit, Dundas Street bike lanes are being upgraded. Pictures here is poured in place curbs on Dundas at Coxwell. #biketo
Tweet media one
13
25
282
@BeckyKatz96
Becky Katz
2 years
It’s alive! Milestone moment- Toronto’s first #biketo protected intersection is officially open.
@inHrEye
kanchan 🍿
2 years
Time lapse view of a full signal cycle from the SE corner.
3
11
69
10
36
283
@BeckyKatz96
Becky Katz
1 year
A city photographer recently took a few photos of the Danforth/Kelvin upgrade project. It is so lovely. @TO_Cycling_Ped designed this in-house and oversaw the construction. We implemented several new construction standards here that are worthy of repeating. #biketo #walkto
Tweet media one
Tweet media two
Tweet media three
9
26
272
@BeckyKatz96
Becky Katz
3 years
Visited the YorkU #biketo project! It has TO’s 1st ‘green gutter’ b/w the bikeway & road. Water will flow into the planted area. If there is lots of water- it can overflow to catch basins along the sidewalk. Very cool green infrastructure baffling system. See my ‘artistic’ markup
Tweet media one
10
52
270
@BeckyKatz96
Becky Katz
1 year
So thrilled to see Toronto’s #biketo low wall cycling barriers are inspiring cities across NA. Developed by @inHrEye for Lake Shore Boulevard b/w First and Norris and then improved over time. Our adopted standard is here:
@Spottnik
Greg Spotts
1 year
Toronto Style Barrier
10
8
164
25
39
261
@BeckyKatz96
Becky Katz
3 years
What a good #biketo day. Today, City Council approved the Cycling Plan Near Term Program 22-24, and made all the #activeto 2020 projects (~20 km) permanent. So glad I’ll be able to bike side by side on Dundas in perpetuity. and
Tweet media one
12
32
246
@BeckyKatz96
Becky Katz
3 years
A lovely photo from a team member. #shawstreet #biketo
Tweet media one
5
19
241
@BeckyKatz96
Becky Katz
1 year
Specialty #biketo paver alert at Cherry Street and Mill Street
Tweet media one
12
24
231
@BeckyKatz96
Becky Katz
11 months
They are, in fact, pretty darn nice.
@OhUrbanity
Oh The Urbanity!
11 months
The new bike lanes on College Street in Toronto are looking pretty darn nice
21
101
953
10
16
225
@BeckyKatz96
Becky Katz
2 years
Something concrete in these uncertain times. Spent a lovely, chilly morning on site at the Woodfield contra-flow #biketo lane.
Tweet media one
18
16
222
@BeckyKatz96
Becky Katz
19 days
Career Update: After 5 incredible years leading Toronto’s Cycling & Pedestrian Projects Unit, I’m excited to announce that I'll be joining Transportation Services' Operations and Maintenance Section. 🧵 #biketo #walkto (Here I am on my 1st day at a meeting about Bloor St)
Tweet media one
20
15
224
@BeckyKatz96
Becky Katz
1 year
The newest section (just east of Strachan) of the Wellington two way cycle track is already popping. Fresh asphalt = smooth ride. #biketo
8
20
215
@BeckyKatz96
Becky Katz
11 months
I didn't start my career being passionate about cycling. But something I have come to love about building bikeways is that they can be a big status quo disrupter, motivating huge multi-modal improvements. Before College was redone, the transit stops were tiny. Not anymore #biketo
Tweet media one
Tweet media two
10
24
207
@BeckyKatz96
Becky Katz
1 year
Through the awesome Vision Zero team, the Dundas bike lanes b/w Alton and Greenwood on the south side are being upgraded to cycle tracks with new concrete and planted bulb outs. #biketo #walkto
Tweet media one
Tweet media two
10
16
194
@BeckyKatz96
Becky Katz
3 years
The beginnings of a new protected intersection - Lake Shore Blvd and Cherry.
Tweet media one
2
19
193
@BeckyKatz96
Becky Katz
2 months
Almost there. #biketo
Tweet media one
5
10
182
@BeckyKatz96
Becky Katz
1 year
Look at this beautiful upgrade. Quick build projects are great for repurposing space fast, but they can lack grace and the feeling of permanence. So we implemented this intersection upgrade to show what is possible between a quick build and a full reconstruction. #biketo #walkto
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
1 year
Small-scale construction projects built or in progress include poured concrete medians at intersections along Woodfield Rd to provide protection for people cycling, and a raised crosswalk and bioretention curb extensions at Danforth Ave and Kelvin Ave... (5/12)
Tweet media one
1
4
63
11
27
156
@BeckyKatz96
Becky Katz
2 months
There is nothing better than cycling home on a perfect summer evening all on infrastructure the @TO_Cycling_Ped team built in the last five years. (Palmerston -> College -> Brunswick -> Bloor -> Ave -> Davenport) #biketo
7
11
141
@BeckyKatz96
Becky Katz
1 year
The Esplanade <-> Mill Street b/w Parliament & Hahn: before & after This new short, but oh so sweet bikeway next to the existing lovely park path is making an impact. W/ high volumes of folks walking, rolling, and riding, giving everyone more space is essential. #biketo #walkto
Tweet media one
Tweet media two
7
13
134
@BeckyKatz96
Becky Katz
1 year
A lovely new block of the Wellington bikeway between Niagara and Tecumseth. Previously this was a painted bike lane in the same direction as motor vehicle travel and adjacent to the parked cars. #biketo
11
18
127
@BeckyKatz96
Becky Katz
3 months
I joined a colleague at the Don Mills/Overlea office for the day and on the way home, I had a chance to check out the construction at Millwood/Pape/Donlands. This is a big intersection reconstruction. I love when renderings come to life m #biketo
Tweet media one
13
5
130
@BeckyKatz96
Becky Katz
1 year
A new green infrastructure bulb out under construction on Palmerston at College St. As part of streetcar track replacement project, our team worked with many to incorporate major upgrades to the painted bike lanes and the pedestrian realm. Ped 🤝Bikes🤝 Greening #walkto
Tweet media one
8
13
129
@BeckyKatz96
Becky Katz
4 years
Shuter Street reconstruction has begun! @TO_Cycling consulted on this project in the fall. The old school bike lanes will be upgraded to protected bike lanes. More info is here:
Tweet media one
Tweet media two
Tweet media three
6
20
113
@BeckyKatz96
Becky Katz
11 months
The westside of University is under construction. Bikeway closures stink, but the upgrades will be worth it. To ease the pain, here's a taste. Also protected intersections at Gerrard & Elm to come. (these are not the final plans for you LAs and PEngs out there) #BikeTO
Tweet media one
5
12
116
@BeckyKatz96
Becky Katz
6 months
Today I went for a stroll to check out the construction progress on University between College and Dundas. Raised concrete and planted buffer, protected intersection elements at Gerrard and wide comfy cycle tracks. Check out a few marked up photos. #biketo
Tweet media one
Tweet media two
6
10
116
@BeckyKatz96
Becky Katz
2 years
‘It’s too complicated. It’s too expensive. The road needs to be regraded & catchbasins moved.’ It always makes me laugh that our profession figured out this👇, but balks at figuring out how to raise a bikeway 100mm above the road. Glad to work with many who are up to challenge 💪
Tweet media one
2
20
113
@BeckyKatz96
Becky Katz
3 years
Lovely to spot a public space built to naturally absorb rainwater. A good reminder that infrastructure can be green and beautiful . #greento
Tweet media one
3
16
106
@BeckyKatz96
Becky Katz
3 months
Obviously, @transitapp and @BikeShareTO , always and forever.
Tweet media one
@transitapp
Transit
3 months
me and who
3
8
179
0
8
108
@BeckyKatz96
Becky Katz
1 year
A new standard indeed: (through the College St project, we developed a new construction standard for raised intermediate height cycle tracks that can be applied on future projects.)
@m_layton
Mike Layton
1 year
Adding a pic of college. These lanes are setting a new standard.
Tweet media one
3
0
65
6
11
107
@BeckyKatz96
Becky Katz
3 years
A short section of protection on a contra-flow bike lane on a low volume local street can be a nice way to define the space and help guide people driving and cycling.
Tweet media one
4
9
103
@BeckyKatz96
Becky Katz
3 years
Excited to see @TO_Cycling progress on the #Activeto Yonge St complete street pilot. Looking forward to walk, bike and patio time on Yonge this summer. #biketo
Tweet media one
4
13
102
@BeckyKatz96
Becky Katz
2 years
Excited to be heading home to #biketo / #walkto today. But vacationing in Bogota was awesome. I spent the better half of two weeks biking, busing, walking, and eating. Lots of infrastructure inspiration to be had- both the good and the bad.
2
14
103
@BeckyKatz96
Becky Katz
2 years
I am surprised and delighted by people’s enthusiasm about metal bollards. It’s a good reminder that often the simplest of details can make a project. And that small improvements make a difference. It’s so lovely to see people excited about #biketo infrastructure.
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
2 years
Work is progressing on Argyle St just east of Ossington Ave, where permanent curb islands with metal bollards are being installed to provide separation between people cycling EB in the contra-flow bike lane and WB motorists turning left or right.
Tweet media one
Tweet media two
3
8
131
4
14
97
@BeckyKatz96
Becky Katz
2 years
Little changes can go a long way. A wider landing on the north side of Lake Shore Blvd at the lower Cherry St intersection #walkto #biketo
Tweet media one
Tweet media two
6
7
92
@BeckyKatz96
Becky Katz
1 year
Obviously y’all need a paver update;
Tweet media one
4
4
95
@BeckyKatz96
Becky Katz
3 years
Every month is #BikeMonth for me. 😊 Super proud at what @TO_Cycling and @TO_Transport accomplishes everyday- with integrity, grit and heart for the public they serve
Tweet media one
5
9
89
@BeckyKatz96
Becky Katz
4 years
Late in the season, but @TO_Cycling is still making awesome progress on expanding and upgrading bikeways across Toronot.
@inHrEye
kanchan 🍿
4 years
Lansdowne Avenue being installed right now at record speed. NB complete, SB underway. Should be done tomorrow.. then on to Runnymede #bikeTO
Tweet media one
Tweet media two
Tweet media three
Tweet media four
6
4
71
8
14
87
@BeckyKatz96
Becky Katz
1 year
Is this too on brand? (Wish I had worn blue pants.) Glad to see the bike counter in action and to ride @TO_Cycling_Ped city cargo bike (carrying tools and a picnic for a staff post work picnic hang out).
Tweet media one
7
3
86
@BeckyKatz96
Becky Katz
2 years
It’s fall! Perhaps the best time to explore #biketo projects. Every year, a colleague and I go on a trail ride to visit construction and see potential future connections. This year we cycled through North York and Scarborough (map is not 100% accurate)
Tweet media one
3
11
86
@BeckyKatz96
Becky Katz
1 year
And we are done friends:
Tweet media one
2
9
84
@BeckyKatz96
Becky Katz
3 years
It's hard to believe, but today is my 2 yr anniversary of joining @TO_Transport @TO_Cycling and moving to TO. It hasn't been a simple transition, but it has been a honour. On my 1st day, I attended a Bloor stakeholder mtg. Happy that I said yes to every community mtg pre-pandemic
Tweet media one
6
7
84
@BeckyKatz96
Becky Katz
1 year
I had a chance to check out some under construction #biketo #walkto upgrades on Wilmington Ave. Wider sidewalks, raised cycle track with a school bus layby and a raised bus/bike stop. The school is going to need more bicycle parking soon!
Tweet media one
Tweet media two
3
8
84
@BeckyKatz96
Becky Katz
3 years
When you help a friend move, @HappyFietsCA is there for you! #biketo #cargobiketo
Tweet media one
3
17
81
@BeckyKatz96
Becky Katz
1 year
New beautiful sidewalks and raised intermediate height cycle tracks on The Kingsway. #BikeTO #walkto
Tweet media one
1
5
79
@BeckyKatz96
Becky Katz
2 years
I had the chance to check out @to_cycling_ped construction at Danforth/Kelvin. This project could be a model for permanent upgrades to 'quick build' projects w/o larger roadwork. (In the photos/plan, I circled the same light pole in red for comparison). #biketo #walkto
Tweet media one
Tweet media two
Tweet media three
6
7
76
@BeckyKatz96
Becky Katz
4 years
Amazing work by @TO_Cycling and Road Ops on the design and installation of an interim raised accessible loading platform near hospital row. Cycling infrastructure should not make roads less accessible for people with disabilities. #bikeTO (platform is still a work in progress)
Tweet media one
4
12
74
@BeckyKatz96
Becky Katz
3 months
I had a meeting in North York and since it was a beautiful morning, I cycled up and took the opportunity to check out the #walkto and #biketo infrastructure. It’s amazing. Can’t wait for the Champagne/Alness connect to start construction.
5
3
71
@BeckyKatz96
Becky Katz
4 years
The beginnings of a complete street. Beautiful ride this morning along the whole length of The Danforth pilot section (Broadview to Dawes). The communities surrounding the Danforth are so varied and vibrant.
Tweet media one
Tweet media two
2
12
69
@BeckyKatz96
Becky Katz
1 year
When a cycle track width is on the narrow side (<2.1m), we have been implementing a beveled edge to avoid someone’s pedal hitting the curb. Look at our awesome contractors hand troweling the beveled edge for cycling safety and comfort. #biketo
5
4
69
@BeckyKatz96
Becky Katz
5 months
Yesterday was a good day. The East Don trail bridge over the rail line near the Flemingdon golf course has been set. A big milestone for an important and challenging project #walkto #biketo
6
8
69
@BeckyKatz96
Becky Katz
4 months
I love being on site and seeing all the little details of a project. On University, the medians b/w the road and bike lane are keyed into the concrete base of the road. Can’t wait to ride this route and mull over how all the little details make a big difference. #biketo .
Tweet media one
Tweet media two
1
3
68
@BeckyKatz96
Becky Katz
2 months
It was great to show @JasonThorne_RPP around #biketo and hear more about his new role and his past accomplishments and approaches in his role at the City of Hamilton 🤩
@JasonThorne_RPP
Jason Thorne
2 months
The City of Toronto, and especially the @TO_Cycling_Ped team, don’t get nearly enough credit for how much they have accomplished in the last couple years to build out the City’s cycling network. Today I got a tour of just a small slice of that network from @BeckyKatz96 .
Tweet media one
1
8
65
3
3
66
@BeckyKatz96
Becky Katz
7 months
Every year the team strives to make Toronto’s cycling map better. This year, I am happy to share that contra flow bike lanes are now included on the map and legend. (Most contra flows were previously shown as on-street shared connections). #biketo
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
7 months
The 2024 Toronto Cycling Map is now available to download from the City's cycling webpage. Use the map to plan your route, locate @BikeShareTO stations, and find bicycle lockers or stations for secure storage.
Tweet media one
Tweet media two
7
7
46
2
10
66
@BeckyKatz96
Becky Katz
4 years
Our @TO_Cycling team had a virtual social gathering to celebrate the passing of our first two Council reports for #biketo #walkto and #activeto projects. I found a very appropriate beer to celebrate with (one of the projects approved is upgrades to the Davenport bike lanes).
Tweet media one
7
3
64
@BeckyKatz96
Becky Katz
4 years
The people in the last photo are four amazing members of @TO_Cycling who worked to bring Bloor and every other cycling project to life this year! Three cheers to them!
@CycleToronto
Cycle Toronto
4 years
Tweet media one
Tweet media two
Tweet media three
Tweet media four
7
18
131
3
6
62
@BeckyKatz96
Becky Katz
1 year
Removing a bit of asphalt here and there, can add up and make the pedestrian and cycling realm nicer.
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
1 year
A bioretention planter has been constructed at the NW corner of Dundas St E and Hiltz Ave between the cycle track and motor vehicle travel lane. The plantings include Catmint, Prairie Dropseed, Fragrant Sumac and Dwarf Japanese Yew, which are native and durable. (1/2)
Tweet media one
5
12
230
3
4
63
@BeckyKatz96
Becky Katz
3 years
Big bike and walk things coming to Bayview b/w River St and Mill St. This scene will be very different, very soon. #biketo #walkto
Tweet media one
6
5
61
@BeckyKatz96
Becky Katz
1 year
Here’s another beautiful before and after on the south side of Bloor between St George and Devonshire. Raised bikeway, new larger tree pits, permanent pavers and more! #walkto #biketo
0
5
58
@BeckyKatz96
Becky Katz
1 year
The pedestrian and cycling connection at the south end of Riverdale Park (b/w Langley and the driveway to the ped bridge over the Don) is going to be much nicer soon. New path, plaza, seating, bike parking and an e-bike @BikeShareTO charging station is underway. #biketo #walkto
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
9
57
@BeckyKatz96
Becky Katz
3 years
This week I wrote >400 emails, reviewed 8 project decks, 4 briefing documents & 3 rfps, interviewed 5 candidates, presented to Ottawa staff, responded to 2 media requests, answered ?s at IEC on 2 huge reports, spoke with 5 constituents, 6 councillors and checked in w/ my team.
5
0
58
@BeckyKatz96
Becky Katz
3 years
The curbs have arrived. #activeto #biketo #curbto
Tweet media one
6
8
58
@BeckyKatz96
Becky Katz
1 year
A beautiful morning to #biketo or ride the bus on The Esplanade. I watched several people board the bus with ease using the zicla platform- working just as it was intended to do. (Also if anyone finds a blue and gold Beton Brut earring- it’s mine )
Tweet media one
2
5
56
@BeckyKatz96
Becky Katz
4 years
What a beautiful day to claim a street for people. Bayview is filled with families #ActiveTO #BikeTO
Tweet media one
2
10
57
@BeckyKatz96
Becky Katz
3 years
Working on street design, can make it hard for me to unwind. Even a walk or bike ride can be a time to observe every deficiency or make work to dos. But sitting on my fav street bench on a lovely fall night…melts the stress. The vote of confidence from my dinner tonight helped.
Tweet media one
4
1
55
@BeckyKatz96
Becky Katz
4 years
Visited one of our last civil projects of the year. We are filling a short, but essential gap on the waterfront trail. A trail and sidewalk are being installed now on Kingston Rd (Glen Everest and Lake Hurst). There’s so much demand, people are already using it. #biketo
Tweet media one
Tweet media two
3
5
54
@BeckyKatz96
Becky Katz
3 months
@m_layton Without @m_layton , @joe_cressy and the hospitals executives leadership, we could not have implemented University and so so so many other projects across Toronto. Thankful to them everyday of my job 🙏
0
4
54
@BeckyKatz96
Becky Katz
3 years
So much space for people this weekend. Thanks #activeto !
Tweet media one
Tweet media two
2
13
50
@BeckyKatz96
Becky Katz
2 years
So proud of the work contained in this report (Don Mills/Overlea, Martin Grove and Gerrard) and @TO_Cycling ’s commitment to the public and active transportation design.
@GraphicMatt
Matt Elliott
2 years
The Q2 bike lane installation plan CARRIES unanimously via a show of hands. It includes lanes on Gerrad East and Overlea Boulevard. Councillor Stephen Holyday added a motion in support of the Etobicoke Greenway project too.
2
9
43
10
8
52
@BeckyKatz96
Becky Katz
8 months
I love protected bikeways, but there is something to be said about cycling in a full lane on a street with controls that limit motor vehicle volumes. #biketo
6
1
51
@BeckyKatz96
Becky Katz
11 months
Congrats @Spacing and to @trainguy89 and the other amazing folks featured in the 20th anniversary edition. I so enjoyed the party and meeting some of my real life muses. Hafeez and others inspire me to learn more and keep going, no matter the challenge ahead.
@trainguy89
Hafeez A.
11 months
But special shoutout goes to @BeckyKatz96 . It was a pleasure to finally meet and chat about cycling projects in-person!!
Tweet media one
1
0
15
3
3
51
@BeckyKatz96
Becky Katz
3 months
Actually the University project started in 2010: however the centre running cycle tracks failed by one mistaken ‘no’ vote. Fun fact- when we did the activeto project, we reused the 2010 renderings for the project website and notices. #biketo
@observinthecity
Observing The City
3 months
Construction of the new bike lanes on Umiversity Ave is complete, and they set a gold standard for lanes on arterials. How did we get here? 🧵
109
208
2K
5
7
50
@BeckyKatz96
Becky Katz
1 year
Excited to apply this great guidance to future projects. @TO_Cycling_Ped team members collaborated on this new protected intersection guide for Ontario. Our team’s annual accessibility site visits helped inform some of the must, should, consider design decisions. #biketo
@MattPinder1
Beyond the Automobile
1 year
There's a new protected intersection guide in town. The Ontario Protected Intersection Guide is hot off the press and full of new innovations. A🧵covering some of the highlights: /1
Tweet media one
6
48
152
4
8
47
@BeckyKatz96
Becky Katz
2 years
The College Street track replacement and bike lane upgrade project is starting next week: . Such good news to hear upon returning from my vacation. I won’t miss this winter condition on the corridor. #biketo
Tweet media one
3
10
47
@BeckyKatz96
Becky Katz
5 months
It’s a beautiful night to ride home with a friend. (Or walk home from the gym and snap some pictures) #biketo #walkto
Tweet media one
0
5
47
@BeckyKatz96
Becky Katz
3 months
Annotated version
Tweet media one
1
3
47
@BeckyKatz96
Becky Katz
3 years
A lovely jog between Augusta and Brant on Richmond. Sometimes it’s the little connections that make the biggest differences. #biketo
5
8
46
@BeckyKatz96
Becky Katz
1 year
Local bikeways can be/are dreamy when you ensure low speed and low volumes motor vehicle traffic. Toronto’s Shaw Street, The Esplanade-Mill Street and the current proposed Dan Leckie-Portland are all great examples.
@jen_keesmaat
Jennifer Keesmaat
1 year
This has been weighing on me lately: we do need to be designing the next generation of cycling infrastructure in our cities. Jamming bike lanes onto crowded arterials isn’t the dream. Imagine a backbone of residential streets with separated cycling facilities on them. Imagine
Tweet media one
95
88
901
6
5
47
@BeckyKatz96
Becky Katz
1 year
One way streets for cars can simplify intersections, reduce non local trips and maintain curbside loading. Keeping two way cycling travel can shorten trips for people who use pedal power to get around. Cheers to the simple and efficient contra-flow bike lane.
Tweet media one
6
4
46
@BeckyKatz96
Becky Katz
4 years
I am really proud to have helped so many people make so many more safe cycling trips in the city #bikeTO
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
4 years
The 2020 temporary #ActiveTO cycling network created 25 km of safe, separated on-street bike lanes that helped connect our network like never before and encouraged new trips by bike. Learn more at #biketo
Tweet media one
2
6
33
2
1
45
@BeckyKatz96
Becky Katz
1 year
Congrats to Seattle! What a beautiful protected intersection with a traffic diverter- an inspiring combo. I can’t wait to see the construction and finished product photos.
@Qagggy
Qagggy!
1 year
It’s official! Construction of Seattle’s first protected intersection begins as soon as tomorrow.
Tweet media one
33
100
1K
0
5
45
@BeckyKatz96
Becky Katz
9 months
When I first moved to Toronto, I read a paper about LTS from @shoshannasaxe . I cold called asking if we could explore TO specific research. The partnership has been amazing. @mbonsma and @bolin0812 are guiding us on how „best“ to invest in #biketo . Read about the work below:
2
11
44
@BeckyKatz96
Becky Katz
6 months
New cycle track extension alert #biketo
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
6 months
In 2020, the University Avenue-Queen's Park cycle tracks were installed between Bloor St and Adelaide St, and were extended to 50 m south of King St W in 2021. The cycle tracks have been further extended to 150 m south of Wellington St, with concrete curbs added for separation.
Tweet media one
Tweet media two
6
7
103
0
3
44
@BeckyKatz96
Becky Katz
1 year
A little NYC fun. Seeing my family (aka making them go on bike rides and walks to new infrastructure projects) #transportationtourism
Tweet media one
0
0
43
@BeckyKatz96
Becky Katz
2 years
Our Section, Project Design & Management, is hiring 4 project leads to support capital design and delivery of accessibility, pedestrian realm, trail and street art projects! We are focusing on recruiting people with lived experience as a person with a disability. #walkto #biketo
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
2 years
Join our team to help create a more livable city and keep Torontonians moving safely! We're hiring for two Project Leads within the Cycling and Pedestrian Projects unit to deliver accessible trail improvement projects and sidewalks. Apply by Nov 28.
Tweet media one
0
22
46
2
15
41
@BeckyKatz96
Becky Katz
1 year
A perfect day for an impromptu tour by @Ju_desaulniers , @CyclistBartek and @VeloQuebec . So good to be with colleagues who know the detail details- from material selection to marking standards. Montreal is an inspiration due to the dedication/expertise of their passionate staff.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
3
41
@BeckyKatz96
Becky Katz
3 years
A lovely day for a long walk and a short bike ride. Enjoyed a ramble through the streets of Yorkville today.
Tweet media one
0
2
40
@BeckyKatz96
Becky Katz
4 years
It’s been a big Bloor week. Tonight, I am enjoying the delicate dance of #DestinationDanforth with a snack from the @the_bigcarrot .
1
1
39
@BeckyKatz96
Becky Katz
1 year
😍😍😍wide and lovely #biketo bikeways are underway on College Street.
@aka_Reynolds
Daniel Reynolds
1 year
[Bruce Springsteen voice] Oh they're widening the boulevard on College Street
Tweet media one
Tweet media two
4
1
35
0
3
40
@BeckyKatz96
Becky Katz
4 years
Extremely proud to work on the @to_cycling team. Bloor Street permanent cycle tracks installation has started after a year of in-depth consultation and detail design with a focus on multi modal safety improvements
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
4 years
#CityofTO work has started on the Bloor West Extension connecting from Shaw to Runnymede. Please be patient as crews work to deliver this new bikeway project. Weather permitting most of the paint should be done in 2 weeks and barriers soon after #BikeTO
Tweet media one
Tweet media two
Tweet media three
7
22
88
2
1
39
@BeckyKatz96
Becky Katz
4 years
While pavement markings and civil construction can’t continue in the colder weather, our team keeps making progress on projects across Toronto. Just finished a great signal safety improvement:
@TO_Cycling_Ped
Toronto Cycling and Pedestrian Projects
4 years
Have you noticed the changes at Bloor St W and Keele/Parkside? Ped walk times have increased, bike signals have been added, and eastbound drivers turning right have their own signal and should turn only when it's green, so they don't overlap with people cycling. #walkto #biketo
10
26
106
2
1
38
@BeckyKatz96
Becky Katz
2 years
Award for cutest contraflow bike lane? The new George St contraflow bike lane is a winner in my book- installed as part of The Esplanade-Mill Street project!