Sunil H P Profile Banner
Sunil H P Profile
Sunil H P

@sunilho

620
Followers
640
Following
464
Media
13,696
Statuses

Opinions expressed are solely my own and do not express the views or opinions of my employer.

bangalore
Joined January 2010
Don't wanna be here? Send us removal request.
Pinned Tweet
@sunilho
Sunil H P
6 years
On this #RepublicDayIndia , imperative that we remember and abide by the Constitution Of India
Tweet media one
2
1
9
@sunilho
Sunil H P
2 years
An eye opener thread. Now with so many govt backing companies also having got the certificate. Will they all be subjected to their Boycott.
@zoo_bear
Mohammed Zubair
2 years
Several RW Politicians and RW trolls have been trending #BoycottHimalaya by sharing Himalaya's Halal certificate. Just because Himalaya is owned by a Muslim. BTW 9 out of 10 in Himalaya leadership team of Himalaya are Hindus. THREAD on their hypocrisy and Muslim Hate ๐Ÿ‘‡๐Ÿ‘‡
Tweet media one
Tweet media two
Tweet media three
Tweet media four
988
4K
10K
1
50
205
@sunilho
Sunil H P
11 months
๐—ฃ๐—ต๐—ผ๐—ฒ๐—ป๐—ถ๐˜… ๐— ๐—ฎ๐—น๐—น ๐—ผ๐—ณ ๐—”๐˜€๐—ถ๐—ฎ, A Welcome addition to North Bengaluru. Many Shops yet to Open though. Interiors done very tastefully and looks premium
Tweet media one
Tweet media two
Tweet media three
Tweet media four
11
7
197
@sunilho
Sunil H P
4 months
๐๐ก๐š๐ฌ๐ž ๐Ÿ๐ | ๐€๐ข๐ซ๐ฉ๐จ๐ซ๐ญ ๐Œ๐ž๐ญ๐ซ๐จ | ๐๐‚๐‚ Bagaluru Cross Station on Airport line becomes the first station on Airport line to receive all U Girders. This is the first elevated station in Namma metro with Island platform.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
8
17
176
@sunilho
Sunil H P
1 year
ITD cementation launches the final segment on Reach 1 extension. On temp supp being stressed and will be lowered to its pedestal. May2017 test piling at Lowry premises. Kudos to BMRCL and ITD. Parapet erection to follows @maddyvoldy @shaamblr @ChristinMP_ @naveenm01 @Lolita_TNIE
Tweet media one
Tweet media two
Tweet media three
Tweet media four
7
22
163
@sunilho
Sunil H P
6 months
Bangalore Metro | Airport Metro : Bagalur Cross Metro Station becomes the first station on Airport line ( phase 2B ) with all its Concourse beams and Platform beams cast. The i-girders for these are lined up near Jakkur and can be placed any time.
Tweet media one
Tweet media two
2
10
154
@sunilho
Sunil H P
1 year
After weeks of waiting and obtaining all approvals, NCC has achieved the erection of first U girders on Airport line near Chikkajala ( PKG 3 ). Kudos to NCC , BMRCL and AS Cranes @maddyvoldy @shaamblr @ChristinMP_ @naveenm01 @Lolita_TNIE @NanuShreyasMs #nammametro PC : AS Cranes
Tweet media one
Tweet media two
Tweet media three
Tweet media four
6
14
152
@sunilho
Sunil H P
2 years
AFCONS INFRA does the first full span girder launching using LG. U Girder placed between ORP208 And ORP209 near bellandur on phase 2a , ORR line. Wishing them a safe and speedy girder launches @cpronammametro @srivasrbmrccoi1 @maddyvoldy @shaamblr @ChristinMP_TOI @0RRCA
Tweet media one
Tweet media two
5
19
150
@sunilho
Sunil H P
2 years
Bangalore Metro | Phase 2B | Airport Metro | NCC Ltd Expect some action soon. AS Crane brand new puller and trailer with the U girder loaded at Doddajala Yard Soon PKG 3 and PKG 2 must see U girders launching PC : AS Cranes
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
15
137
@sunilho
Sunil H P
2 years
Concrete Bedding completed on OWG. LG has advanced to the OWG to enable last span erection. first segment has arrived on a flat bed at site. @maddyvoldy @shaamblr @ChristinMP_ @naveenm01 Finally ITD must be thanking their stars. also tile laying works for the bus bay footpath.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
7
13
133
@sunilho
Sunil H P
2 years
Bangalore metro | Reach 3C | Green Line Extension | Nagasandra to BIEC - Sep 2022 Updates
8
17
130
@sunilho
Sunil H P
1 month
๐๐ก๐š๐ฌ๐ž ๐Ÿ๐ | ๐€๐ข๐ซ๐ฉ๐จ๐ซ๐ญ ๐‹๐ข๐ง๐ž | ๐“๐ซ๐š๐œ๐ค ๐–๐จ๐ซ๐ค๐ฌ ๐›๐ฒ ๐‹&๐“ And Now L&T begins track works on the Airport Line too. Seen here are Flash butt welding machine and rails placed for welding them into a long rails near Jakkur Aerodrome. plinth casting next.
Tweet media one
Tweet media two
Tweet media three
1
15
125
@sunilho
Sunil H P
3 months
Nature is the biggest leveller. During Bengaluru floods there were posts blaming Blr and its infra while claiming they'd be better off up north. City with best infra and double funded by State and Centre is in the same situation today. Earlier Mumbai , Chennai, Hyd too.
@timesofindia
The Times Of India
3 months
#DelhiRains | A car submerged in water and roads heavily flooded due to continuous downpour in Delhi (Visuals from Minto Road)
44
73
253
5
18
122
@sunilho
Sunil H P
4 months
๐๐ก๐š๐ฌ๐ž ๐Ÿ๐š | ๐Ž๐‘๐‘ ๐Œ๐ž๐ญ๐ซ๐จ | ๐“๐ซ๐š๐œ๐ค ๐–๐จ๐ซ๐ค๐ฌ The contractor ๐‹&๐“ has set up a yard and started mobilizing rails. As soon as ๐’๐๐‚ ( most likely ) / ๐€๐…๐‚๐Ž๐๐’ hands over their first stretches, rail welding and track plinth casting works should start. ๐Ÿ‘
Tweet media one
Tweet media two
Tweet media three
6
14
107
@sunilho
Sunil H P
4 months
๐๐ก๐š๐ฌ๐ž ๐Ÿ - ๐‘๐ž๐š๐œ๐ก ๐Ÿ“ | ๐˜๐ž๐ฅ๐ฅ๐จ๐ฐ ๐‹๐ข๐ง๐ž | ๐‘๐จ๐ฅ๐ฅ๐ข๐ง๐  ๐ฌ๐ญ๐จ๐œ๐ค Consort Digital & DAMM India announce the completion of testing & integration of MCX ONE Train System with Mitsubishi Train Control & Management System (TCMS) of the new CRRC RS PC : Consort Digital
Tweet media one
3
10
102
@sunilho
Sunil H P
3 months
๐Ž๐‘๐‘ ๐š๐ง๐ ๐€๐ข๐ซ๐ฉ๐จ๐ซ๐ญ ๐Œ๐ž๐ญ๐ซ๐จ : Another of the systems contract awarded. 33 KV DISTRIBUTION, 750V DC THIRD RAIL TRACTION ELECTRIFICATION and Sub system awarded to ๐’๐ข๐ž๐ฆ๐ž๐ง๐ฌ - ๐‘๐•๐๐‹ ๐‰๐• for โ‚น 3,942,390,663.45
Tweet media one
Tweet media two
1
13
94
@sunilho
Sunil H P
2 months
Milling and resurfacing has begun on B Narayanapura flyover and Mahadevepura Flyover on ORR. This is very much needed to be done on all split flyover on ORR since the ride is very bumpy @BBMPAdmn @BBMPCOMM please help get the joints smoothened out. @ChristinMP_ @naveenmzs @0RRCA
Tweet media one
Tweet media two
Tweet media three
Tweet media four
7
11
93
@sunilho
Sunil H P
2 years
Final breakthrough of TBM Vindhya at RT-03. With this L&T completes tunneling in both packages. Congrats to BMRCL,L&T and all involved. @cpronammametro @srivasrbmrccoi1 @ChristinMP_
Tweet media one
Tweet media two
Tweet media three
5
7
89
@sunilho
Sunil H P
10 months
Countdown to TBM Tunga breakthrough at K G Halli Metro Station on Reach 6 - Pink line. Much awaited .
Tweet media one
Tweet media two
4
8
85
@sunilho
Sunil H P
1 year
ORR Metro : AFCONS 2nd LG ready to start launching towards Silkboard in the opposite direction of 1st LG. Will have to wait after a couple of span since pier cap yet to be cast. @maddyvoldy @shaamblr @ChristinMP_ @cpronammametro @0RRCA @Lolita_TNIE @NanuShreyasMs @blore_boy
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
8
83
@sunilho
Sunil H P
2 years
The first precast pier cap of Bangalore metro placed by SNC on the ORR Metro Phase 2A pkg 2 . Congrats to Namma Metro @cpronammametro . @naveenm01 @maddyvoldy @ChristinMP_TOI @MDNammaMetro
Tweet media one
Tweet media two
Tweet media three
6
14
83
@sunilho
Sunil H P
8 months
TBM Bhadra achieves breakthrough at KG Halli for Bangalore metro Pink line and completing 91% of tunneling . 22nd of the 24th planned. 2 More to go. Kudos ITD , BMRCL @cpronammametro
Tweet media one
Tweet media two
2
8
80
@sunilho
Sunil H P
9 months
@Lolita_TNIE @NewIndianXpress @XpressBengaluru @KARailway @KannadaPrabha @BBMPAdmn @cpronammametro @srivasrbmrccoi1 @DKShivakumar @siddaramaiah @CPBlr @0RRCA They should get this guy prosecuted without any delay. If anything the land would be for purple line which is on the outer side. This blue line viaduct is on orr service road. How did he wake up one fine day n started throwing tantrums.
4
6
71
@sunilho
Sunil H P
9 months
Biocon signed an MOU with BMRCL @cpronammametro in October 2020 to contribute 65 crores towards the Hebbagodi station construction and related infra. Why didn't these people raise their voice then and now when its done, make fuss.
Tweet media one
Tweet media two
@prajavani
Prajavani
9 months
เฒนเณ†เฒฌเณเฒฌเฒ—เณ‹เฒกเฒฟ เฒฎเณ†เฒŸเณเฒฐเณŠเฒ—เณ† เฒฌเฒฏเณ‹เฒ•เฒพเฒจเณ เฒนเณ†เฒธเฒฐเณ: เฒธเณเฒฅเฒณเณ€เฒฏเฒฐ เฒชเณเฒฐเฒคเฒฟเฒญเฒŸเฒจเณ† #hebbagodimetro
12
34
237
9
16
60
@sunilho
Sunil H P
7 months
You guys do this and the followers go about doing this on public properties. This is at under construction metro piers near Hunasamaranahalli. @OfficialBMRCL
Tweet media one
Tweet media two
Tweet media three
Tweet media four
@PCMohanMP
P C Mohan
7 months
Once again, Modi Sarkar!
25
33
398
2
13
58
@sunilho
Sunil H P
9 months
And on top, tantrums from Railways to even handover place for a skywalk. They literally have made BMRCL run around for something they should have done in the first place.
@KRPURATRAFFIC
K.R.PURA TRAFFIC POLICE.BENGALURU.
9 months
เฒ•เณ†.เฒ†เฒฐเณ เฒชเณเฒฐ เฒฐเณˆเฒฒเณเฒตเณ† เฒจเฒฟเฒฒเณเฒฆเฒพเฒฃเฒ•เณเฒ•เณ† เฒชเณเฒฐเฒคเฒฟเฒฆเฒฟเฒจ เฒธเฒฐเฒพเฒธเฒฐเฒฟ 80-85เฒŸเณเฒฐเณˆเฒจเณ เฒ—เฒณเณ เฒฌเฒฐเณเฒคเณเฒคเฒตเณ†(เฒ—เณ‹เฒกเณเฒธเณ เฒŸเณเฒฐเณˆเฒจเณ เฒฌเฒฟเฒŸเณเฒŸเณ)เฒ’เฒ‚เฒฆเณ เฒŸเณเฒฐเณˆเฒจเณ เฒฌเฒ‚เฒฆเฒพเฒ— เฒŸเณเฒฐเณˆเฒจเฒฟเฒ‚เฒฆ เฒ‡เฒณเฒฟเฒฏเณเฒต&เฒนเฒคเณเฒคเณเฒต เฒชเณเฒฐเฒฏเฒพเฒฃเฒฟเฒ•เฒฐ เฒธเฒ‚เฒ–เณเฒฏเณ† เฒธเฒพเฒตเฒฟเฒฐเฒพเฒฐเณ เฒ‡เฒฆเณเฒฆเณ เฒชเณเฒฐเฒฏเฒพเฒฃเฒฟเฒ•เฒฐเณ เฒฐเฒธเณเฒคเณ† เฒฆเฒพเฒŸเณเฒต เฒธเฒฎเฒฏเฒฆเฒฒเณเฒฒเฒฟ เฒ•เณ†เฒ†เฒฐเณ เฒชเณเฒฐ เฒฐเณˆเฒฒเณเฒตเณ† เฒจเฒฟเฒฒเณเฒฆเฒพเฒฃเฒฆ เฒฌเฒณเฒฟ เฒธเฒ‚เฒšเฒพเฒฐ เฒจเฒฟเฒงเฒพเฒจเฒตเฒพเฒ—เณเฒคเณเฒคเฒฆเณ†.เฒตเฒพเฒนเฒจ เฒธเฒตเฒพเฒฐ/เฒšเฒพเฒฒเฒ•เฒฐเณ เฒธเฒนเฒ•เฒฐเฒฟเฒธเฒฒเณเฒ•เณ‹เฒฐเฒฟเฒฆเณ†
12
5
26
6
9
49
@sunilho
Sunil H P
2 years
@naveenm01 Silkboard to K R Puram should not even be attempted till metro work finishes. Also any stretches part of West ORR ( under DPR Phase ) metro should also not be considered.
2
2
47
@sunilho
Sunil H P
10 months
And here it is after Boring for 401 days since Oct 31,2022 for 1184.4 meters at an average of approx 3 meters a day through hard rock and mixed conditions. 21st out of planned 24 planned breakthroughs. 3 more to go.
Tweet media one
Tweet media two
Tweet media three
1
2
44
@sunilho
Sunil H P
4 months
@srivasrbmrccoi1 @OfficialBMRCL Some pics showing the progress , since it started in Oct 23 - Dec 23- Feb 24and finally April 24
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
5
44
@sunilho
Sunil H P
10 months
And pier getting ready for cast, with shutters assembled at Hebbal
Tweet media one
Tweet media two
@KridePrm
K-RIDE
11 months
#Happenning_now : Casting of First Pile cap of P(11) and piling of P(14), in progress, near hebbal station of the elevated section of Corridor-2 of #Bengaluru_Suburban_Rail_Project #BSRP @MBPatil @AshwiniVaishnaw @SWRRLY @RailMinIndia
10
21
123
1
3
40
@sunilho
Sunil H P
1 year
@cpronammametro Issues LOA for 318 Cars for Pink line as well as ORR metro and Airport Metro. @maddyvoldy @ChristinMP_ @naveenm01
Tweet media one
1
5
39
@sunilho
Sunil H P
6 months
@MoHUA_India @Secretary_MoHUA @HardeepSPuri What about the Bengaluru Metro Phase 3 which were under consideration too. When can we expect an approval so that the project can be set in motion @OfficialBMRCL
@EconomicTimes
Economic Times
6 months
#Cabinet approves Lajpat Nagar to Saket G-Block and Inderlok to Indraprastha #DelhiMetro corridors |
0
4
13
5
7
37
@sunilho
Sunil H P
1 year
@Cribbber @HarshaG89450638 @maddyvoldy @Lolita_TNIE @ChristinMP_ @naveenm01 @Suchithkidiyoor @shaamblr @0RRCA SMEC , the detailed design consultant of ORR metro and part Airport metro had released the below renders. The piers on the median of service road are for walkways as per the 4th pic here which was shared by BMRCL earlier.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
4
35
@sunilho
Sunil H P
10 months
@DCPTrEastBCP @KRPURATRAFFIC @blrcitytraffic Please get this Old FOB removed sir. I believe BMRCL has given go ahead to BBMP to remove the same. that foot print of FOB and landing area can give so much space for road usage too. Now creating an island effect.
2
4
31
@sunilho
Sunil H P
2 years
@prajavani Its high time people realize that accidents are called accident for a reason. Stop , check , attend to the victim first. Dont allow your adrenaline to kick in and commit more grave offence and probably end up hurting more.
1
1
33
@sunilho
Sunil H P
7 months
@Lolita_TNIE @KridePrm It is crazy they are even thinking 77m ( 3 coach ) platforms. No foresight at all. Plus reduction here means Viaduct contractor scope will increase. for all the non technical MD talks, the guy who is proposing is a IRSE technocrat. huh. Seems they want to scuttle the project
0
0
33
@sunilho
Sunil H P
1 month
@maddyvoldy The OWG at Benniganahalli might have serious เฒนเณŠเฒŸเณเฒŸเณ†เฒ‰เฒฐเฒฟ issues once Blue line has a normal composite span next to it . But seriously great news though. One by one all sticky points are getting resolved.
0
0
33
@sunilho
Sunil H P
1 year
@maddyvoldy 100th pier cap of Pkg 2
Tweet media one
0
2
29
@sunilho
Sunil H P
11 months
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
5
29
@sunilho
Sunil H P
1 month
@blrcitytraffic Thanks. Water has drained out and traffic flowing smoothly. Special thanks to @hebbaltrafficps staff whi are staffed in plenty in spite of rain and regulating traffic. ๐Ÿ™๐Ÿป
Tweet media one
Tweet media two
Tweet media three
1
0
30
@sunilho
Sunil H P
2 years
@ChristinMP_TOI @SWRRLY @cpronammametro @Clementcjayakum @MTF_Mobility @0RRCA @bengalurutrains @KARailway @WFRising @WF_Watcher @kar_rail @NammaBengaluroo @HennurBlr I am not sure if our railway division only is like this or all of @RailMinIndia is like this. I have seen Pune metro and Nagpur metro guys getting so much cooperation in their projects. Here our SWR guys are like the saying เฒ’เฒฒเณเฒฒเฒฆ เฒ—เฒ‚เฒกเฒจเฒฟเฒ—เณ† เฒฎเณŠเฒธเฒฐเฒฒเณเฒฒเฒฟ เฒ•เฒฒเณเฒฒเณ.
2
4
29
@sunilho
Sunil H P
10 months
@DCPTrNorthBCP Sir, Cleaning by BTP temporarily is fine. But this should be BBMP's duty. Everything from clogged drains, filling pot hole to manning traffic cannot be BTP job. From Hebbal trps to BEL they have desilted & left silt by the road side. With rain & wind again it clogs again.
1
4
30
@sunilho
Sunil H P
1 year
@maddyvoldy @shaamblr @Lolita_TNIE @ChristinMP_ @naveenm01 @0RRCA @srinualavilli @MTF_Mobility Some more good news, Systems contracts are getting awarded. Track works contract awarded to L&T for ORR Metro (2A) , Airport Metro (2B) and the two depots at Byappanahalli & Shettigere that will support these lines.
Tweet media one
0
5
28
@sunilho
Sunil H P
2 years
@AFCONSInfra Interesting information from AFCONS infra on their U girder launching strategy for Phase 2A , PKG 1 - ORR Metro @maddyvoldy @shaamblr @ChristinMP_ A first in Bangalore and South India using LG for full span U girder launching.
Tweet media one
1
4
28
@sunilho
Sunil H P
10 months
@mahadevapuratrf @acpwfieldtrf @DCPTrEastBCP @Jointcptraffic This is in spite of having a height barrier and 2 guards placed at the entrance of the station and ample direction signages to such lorries to use the lane next to it. Where did it go wrong ?
2
1
26
@sunilho
Sunil H P
2 years
@0RRCA @blrcitytraffic @SplCPTraffic @jointcptraffic @bcptwo @AddlCPEast the only rightful place for these brats are behind bars. Somebody is volunteering with civic work and these guys show such contempt. please lodge a complaint and get them arrested.
1
1
26
@sunilho
Sunil H P
9 months
@naveenm01 @NammaBengaluroo @WFRising @WF_Watcher @east_bengaluru @maddyvoldy @ChristinMP_ @anil_lulla @BAFBLR @NammaBNP Ideally they should exhaust the possibilities within the city first, before taking to sub-urbs. Why make CMP if it is not going to be followed.
0
0
28
@sunilho
Sunil H P
1 year
@MTF_Mobility For what its worth, you guys did well and this needs to be replicated across constituencies in Bangalore.
0
0
27
@sunilho
Sunil H P
1 year
@PScrazy_p @pradeep_c_k @iam_complan_boy @cpronammametro @DKShivakumar @ChristinMP_ @IndexKarnataka @PCMohanMP @siddaramaiah @Tejasvi_Surya @WFRising @NammaBengaluroo @bengalurutrains Roughly this is the plan. the one from BTM to HSR and Ecity loops back near the down ramp towards Madiwala . the second pic is slightly older with the blue line station moved to the other side of flyover.
Tweet media one
Tweet media two
3
3
26
@sunilho
Sunil H P
10 months
@naveenm01 @NammaBengaluroo @east_bengaluru @WFRising @WF_Watcher @MTF_Mobility @BalooET @peakbengaluru @maddyvoldy @bengalurutrains Probably only city where citizens and corporates are so open to participating in public infra creation. Ironically this is the biggest stakeholder that the organization does not feel like keeping informed let alone celebrate.
0
1
25
@sunilho
Sunil H P
1 year
@cpronammametro Why are all the water spouts at station left to road and there is no drain opening. It creates a pool. Why not harvest them in the fancy garden kind of place at 4 sides. create a RWH tank or Recharge well. @srivasrbmrccoi1 @maddyvoldy @ChristinMP_ @Lolita_TNIE
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
3
24
@sunilho
Sunil H P
4 years
@TheMetroRailGuy their casting yard at byappanahalli is also shaping well. Below pic as of Aug 1st week. On the TBM's their MD, Jayanta Basu had informed the investor meet 2 TBM used in Delhi are readily available and already refurbished.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
3
24
@sunilho
Sunil H P
3 years
@ChristinMP_TOI @cpronammametro @SWRRLY 6 months for bmrcl to send to Swr and 6 months to just approve the designs by Swr. ๐Ÿ˜’ such bureaucratic delays only cause loses to public funded projects forgetting the delayed opening.
1
1
25
@sunilho
Sunil H P
10 months
Republic of Outrage we are becoming. The broom is specific to dosa making tawa. ๐Ÿคฆโ€โ™‚๏ธ
@ndtv
NDTV
10 months
Bengaluru Restaurant Cook Using Broom On Tawa Angers Internet, Video Has 15 Million Views
Tweet media one
2K
72
680
2
0
23
@sunilho
Sunil H P
4 months
3 months and thankfully the barricades are removed.
Tweet media one
2
2
23
@sunilho
Sunil H P
5 years
@BLRAirport lots of construction activities but still very clean ๐Ÿ‘
Tweet media one
Tweet media two
Tweet media three
Tweet media four
4
4
22
@sunilho
Sunil H P
9 months
Good news. Thanks to the outgoing MD Anjum Parwez and Welcome to the new MD. Wish he is a hands on person with positive outlook towards public and publishing their achievements in general.
@ChristinMP_
ChristinMathewPhilip
9 months
Just-in: Maheshwar Rao is the new managing director of BMRCL. @cpronammametro
Tweet media one
11
20
164
1
2
21
@sunilho
Sunil H P
2 years
@SudiptaM1983 @cpronammametro @srivasrbmrccoi1 @maddyvoldy @shaamblr @ChristinMP_TOI @0RRCA Goliath/ gantry crane primary purpose is to lift the U girder(1) from flatbed to the transporter (2) which travels on rails till the LG. The LG then erects the next span(3) and auto launches itself to that span. This cycle repeats
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
3
22
@sunilho
Sunil H P
2 years
@SWRRLY @GMSWR @RailMinIndia @BBMPCOMM when will you plan to complete this Railway underpass at Muthyalnagar. The LC has been closed without any alternative. Going out of this area is a nightmare due to ORR traffic piling up on daily basis.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
9
19
@sunilho
Sunil H P
3 months
Titagarh Rail Systems Release on the occasion 32 of the 34 trainsets to be produced. First train expected to be delivered in Aug 2024
Tweet media one
@Suchithkidiyoor
Suchith Kidiyoor
3 months
Titagarh Rail Systems Limited (TRSL) has commenced the production of trainsets as part of a contract with China Railway Rolling Stock Corporation (CRRC) for Yellow Line. @OfficialBMRCL will start receiving coaches from August. @TOIBengaluru
Tweet media one
Tweet media two
4
15
149
1
5
21
@sunilho
Sunil H P
1 year
Pourakarmikas have to stop collection of garbage from their house for a week. What age are we in, if we cannot treat fellow humans as humans. Shame on the lady.
9
2
22
@sunilho
Sunil H P
2 years
@ChristinMP_TOI @cpronammametro @maddyvoldy The respnses to the article seem to have turned into bash the MD. People need to realise that the current MD at helm has speeden up execution and clearly not shy of addressing issues. From the finance background previous MD, he is much better. They are working on revised SOP.
3
3
20
@sunilho
Sunil H P
10 months
Tweet media one
0
1
21
@sunilho
Sunil H P
6 months
@blore_boy Rail grinding machine that BMRCL has.
0
1
21
@sunilho
Sunil H P
11 months
@pro_kamath @iam_complan_boy @ChristinMP_ U girders on one side and i-girders on the others ( hence the height difference ). This is because twin U girder system for up and down lane would not allow for track crossovers & so wherever cross overs are planned, they to use the i-girder ( steel mostly ) and single slab above
1
1
21
@sunilho
Sunil H P
6 years
@RoflGandhi_ Seems this guy cought the spin early on.. ๐Ÿ˜‚ ๐Ÿ˜‚
Tweet media one
0
1
17
@sunilho
Sunil H P
4 years
@BBMPSWMSplComm @BBMPCOMM sir this is at Attiguppe , Vijaynagar, why such contempt for pedestrians. The footpath is hardly 2-3 feet and the saplings have been planted right in the middle ๐Ÿ˜’ @Naveen_MIRROR @ChristinMP_TOI
Tweet media one
Tweet media two
Tweet media three
Tweet media four
8
7
20
@sunilho
Sunil H P
1 year
Super report on Reach 6 - Pink Line
@DeccanHerald
Deccan Herald
1 year
Hop on board with DH as we traverse the #NammaMetro โ€™s pink line, the longest underground network of #Bengaluru metro. In this video, take a first look at the MG road underground metro station and watch a Tunnel Boring Machine (TBM) in action. Full video:
5
32
140
0
2
19
@sunilho
Sunil H P
7 months
@OfficialBMRCL What is the works being done here at Nallurhalli metro station barricading the main carriageway. It is been a week since this, when can we expect it to finish.
Tweet media one
Tweet media two
Tweet media three
1
1
20
@sunilho
Sunil H P
1 year
@srivasrbmrccoi1 @cpronammametro stations along whitefield do not have lights switched on below. Too dangerous in this weather with bikes parked.The only two exceptions I could see are Satya Sai station and Garudacharpalya. At garudacharpalya is very well done with led on piers
Tweet media one
2
5
19
@sunilho
Sunil H P
1 year
@dp_satish @CPBlr @siddaramaiah @CMofKarnataka @DKShivakumar @RLR_BTM Is the commissioner himself wearing a body camera. If so it is a commendable thing and will set a good precedent to other officers. ๐Ÿ‘
1
0
19
@sunilho
Sunil H P
11 months
@naveenm01 @MoHUA_India @NammaBengaluroo @bengalurutrains @maddyvoldy @cpronammametro @MDNammaMetro On the second point, since the SOD for Bangalore metro has been approved for 5 lines ( Purple, Green , Pink, Yellow and now Blue ) lines, they should keep the same. Interoperability between same metro - diff lines is a more important and better possibility than btwn 2 city metros
1
0
18
@sunilho
Sunil H P
2 years
@ChristinMP_TOI @PMOIndia @CMofKarnataka @AshwiniVaishnaw @KridePrm @SWRRLY @bengalurutrains @KARailway @kar_rail @dyamannavar @tarauk @Pruthvinreddy @NammaBengaluroo @WFRising @0RRCA @BluruMobility Finally the first Piling rig arrives at Hebbal after a extended preparatory and mobilisation phase. The batching plant equipment continues to lay on the ground. Luckily though they don't seem to have the tree pain like BMRCL. Transplant in progress after OM issued without court
Tweet media one
Tweet media two
Tweet media three
0
3
19
@sunilho
Sunil H P
1 month
Do you have plans to revive then it makes sense for you to say all this. slowly so many central institutes and residences are popping up here. if so why not the state can use it. or if its forest land let it be a green lung patch as is.
Tweet media one
@prajavani
Prajavani
1 month
HMT เฒ•เฒ‚เฒชเฒจเฒฟเฒฏ เฒœเฒฎเณ€เฒจเณ เฒฎเณเฒŸเณเฒŸเฒฟเฒฆเฒฐเณ† เฒนเณเฒถเฒพเฒฐเณ: เฒ–เฒ‚เฒกเณเฒฐเณ†เฒ—เณ† เฒ•เณเฒฎเฒพเฒฐเฒธเณเฒตเฒพเฒฎเฒฟ เฒŽเฒšเณเฒšเฒฐเฒฟเฒ•เณ† #hmt via @prajavani
33
35
360
1
2
17
@sunilho
Sunil H P
3 years
@cpronammametro finally awards the 2A stretch contracts to AFCONS Infra and Shankaranarayana Constructions. @TheMetroRailGuy
Tweet media one
0
1
17
@sunilho
Sunil H P
3 months
@OfficialBMRCL @srivasrbmrccoi1 after defacing all piers on Airport road to Hebbal, these guys have now started pasting mindless posters on your piers. please penalize them and get it cleared. It sets a bad precedent for others and slowly the piers will be fully defaced.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
1
18
@sunilho
Sunil H P
11 months
@ChristinMP_ @cpronammametro Front evacuation for systems on 3rd Rail Systems have to be avoided. Original DBR had 550mm walk way and finally railway board insisted on unobstructed 610mm and the same was incorporated with Modified U girder design. This is a fail safe mechanism and other metros should adopt.
Tweet media one
Tweet media two
1
4
16
@sunilho
Sunil H P
3 years
@cpronammametro เฒฎเฒพเฒจเณเฒฏ เฒธเฒ‚เฒชเฒฐเณเฒ•เฒพเฒงเฒฟเฒ•เฒพเฒฐเฒฟ เฒ…เฒตเฒฐเณ‡ , เฒ†เฒ—เฒธเณเฒŸเณ-เณจเณฆเณจเณง เฒคเฒฟเฒ‚เฒ—เฒณเฒฟเฒจ เฒฎเฒพเฒธเฒชเฒคเณเฒฐเฒฟเฒ•เณ† เฒ‡เฒจเณเฒจเณ เฒจเฒฟเฒฎเณเฒฎ เฒœเฒพเฒฒเฒคเฒพเฒฃ เฒฆเฒฒเณเฒฒเฒฟ เฒชเณเฒฐเฒ•เฒŸเฒฟเฒธเฒฒเฒพเฒ—เฒฟเฒฒเณเฒฒ. เฒ‡เฒจเณเฒจเณŠเฒ‚เฒฆเณ เฒฆเฒฟเฒจ เฒ…เฒทเณเฒŸเณ‡ เฒ‰เฒณเฒฟเฒฆเฒฟเฒฆเณ† เฒ†เฒ—เฒธเณเฒŸเณ เฒฎเฒพเฒธ เฒฎเณเฒ—เฒฟเฒฆเณ เฒธเณ†เฒชเณเฒŸเณ†เฒ‚เฒฌเฒฐเณ เฒฎเฒพเฒธ เฒถเณเฒฐเณเฒตเฒพเฒ—เฒฒเณ. เฒฆเฒฏเฒตเฒฟเฒคเณเฒคเณ เฒชเณเฒฐเฒ•เฒŸเฒฟเฒธเฒฟ
0
1
17
@sunilho
Sunil H P
3 years
@bengalurutrains But these are not single track structures. These are typical box structures with 7.4m with both up and down line. only diff between green line is the parapet which were bulkier and curvier are now sleek and straight. a single track structure is much smaller like the ones below.
Tweet media one
Tweet media two
2
0
17
@sunilho
Sunil H P
7 months
91,000 Crores.. Santa comes early for some..
@prajavani
Prajavani
7 months
เฒ‰เฒคเณเฒคเฒฐ เฒชเณเฒฐเฒฆเณ‡เฒถ: โ‚น91 เฒธเฒพเฒตเฒฟเฒฐ เฒ•เณ‹เฒŸเฒฟ เฒฎเณŠเฒคเณเฒคเฒฆ เฒฏเณ‹เฒœเฒจเณ†เฒ—เฒณเฒจเณเฒจเณ เฒ‰เฒฆเณเฒ˜เฒพเฒŸเฒฟเฒธเฒฒเฒฟเฒฐเณเฒต เฒชเณเฒฐเฒงเฒพเฒจเฒฟ เฒฎเณ‹เฒฆเฒฟ #UttarPradesh #NarendraModi #YogiAdityanath #BJP #Politics
7
1
32
1
3
16
@sunilho
Sunil H P
1 year
@cpronammametro why are the FOB works taking for ever to complete. This one at dasarahalli part of the 5 FOB Contract awarded in Feb 22. Not even one completed fully @maddyvoldy @ChristinMP_ @Lolita_TNIE @shaamblr
Tweet media one
Tweet media two
Tweet media three
1
3
15
@sunilho
Sunil H P
6 months
@maddyvoldy Hope they are better prepared by the time they award Civil Contracts on 1) Finalized Alignment & Design Drawings 2) Land acquisition 3) Tree permission 4) Utility Mapping 5) Defense / Railway buy in 6) Right of way / Traffic diversions. Today these are major cause of delays.
1
0
15
@sunilho
Sunil H P
2 years
@ChristinMP_ @cpronammametro @exxonmobil @UNNATIindiaNGO @bengalurutrains @IndexKarnataka @kar_rail @WFRising @WF_Watcher @NammaBengaluroo @KARailway @aicctukar @maddyvoldy ๐Ÿ‘๐Ÿ‘๐Ÿ‘ Kudos to the workmen who toiled in Sun, Rain and make it happen. Special thanks to the teams who facilitated this.
0
0
15
@sunilho
Sunil H P
2 months
Guy has gone crazy or losing it. with 5 day working only most people are drifting away from normalcy. Impatient ant, irritated and aggressive at the drop of an hat. Imagine with 70 hour work week. Govts should take back all perks extended to such lose talkers.
@ndtv
NDTV
2 months
Ola CEO Calls For 70-Hour Work Week, Doctor Warns Of Premature Death Risk
Tweet media one
306
408
2K
1
1
15
@sunilho
Sunil H P
2 months
@bengalurutrains These are Veerannapalya station piers. This is a portal station unlike others on median.
0
0
15
@sunilho
Sunil H P
10 months
Tweet media one
1
1
15
@sunilho
Sunil H P
2 months
@madivalatrfps @acpsetraffic @blrcitytraffic @DCPSouthTrBCP @Jointcptraffic @DCPSouthBCP please insist on installing gantry boards with clear directions and a little behind in advance so that drivers can make up their mind and not wait till the last moment. The ones within the airport campus at KIAL are done very well and easy to read.
Tweet media one
Tweet media two
Tweet media three
1
0
14
@sunilho
Sunil H P
4 years
@anusharavi10 @BJP4India @JPNadda May be people should start calling him JP Nadd and not Nadda to drive home the point. Same people would pronounce Odhisha , Telangana and Tripura correctly. Wonder how.. ๐Ÿค”
1
1
13
@sunilho
Sunil H P
2 months
@srivasrbmrccoi1 @OfficialBMRCL last month progress 54.09% and this month 39%. can you please check 39% is too low for 2A and 2B
Tweet media one
Tweet media two
1
1
15
@sunilho
Sunil H P
2 years
Heroes of this feat are our workmen and engineers from L&T. ๐Ÿ‘ A big thank you from all Bangaloreans. A fitting event by BMRCL/ L&T to honor them and present mementos.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
0
15
@sunilho
Sunil H P
11 months
๐Ÿ’›โค๏ธ เฒนเฒธเฒฟเฒฐเฒพเฒ—เฒฒเฒฟ เฒ•เฒฐเณเฒจเฒพเฒŸเฒ• เฒ‰เฒธเฒฟเฒฐเฒพเฒ—เฒฒเฒฟ เฒ•เฒจเณเฒจเฒก ๐Ÿ’›โค๏ธ
Tweet media one
0
1
13
@sunilho
Sunil H P
9 months
@KridePrm invites bids for leasing rolling stock - 264 cars with break up of 80 trains in 4 car configuration and 4 trains in 6 car configuration. Includes maintenance of Rolling stock, Train operations, Depot maintenance.
Tweet media one
Tweet media two
1
1
14