🇮🇳 Amαr Profile Banner
🇮🇳 Amαr Profile
🇮🇳 Amαr

@Amarrrrz

4,264
Followers
83
Following
1,054
Media
6,687
Statuses

#Traveller #Infra #Engineer #Defence ❤️ सच्चा ज्ञान केवल यह जानने में है की आप कुछ नहीं जानते है।

Bharat
Joined October 2012
Don't wanna be here? Send us removal request.
Pinned Tweet
@Amarrrrz
🇮🇳 Amαr
2 months
📍Mumbai Night View ❤️🇮🇳
11
93
689
@Amarrrrz
🇮🇳 Amαr
10 months
Tweet media one
Tweet media two
Tweet media three
Tweet media four
@protosphinx
sphinx
10 months
Modern Indian Railway Station
Tweet media one
126
503
6K
27
103
639
@Amarrrrz
🇮🇳 Amαr
4 months
Work has begun on a home-built bullet train exceeding 250 KMPH, with designs from the Indian Railways ICF in Chennai, Made-in-India bullet trains will utilize more domestic technology on new corridors. Japanese collaboration brings Shinkansen E5 trains reaching 320 KMPH for the
Tweet media one
Tweet media two
Tweet media three
Tweet media four
43
70
612
@Amarrrrz
🇮🇳 Amαr
9 months
Hyundai Motor India is set to invest ₹5,000 crore in General Motors India's Talegaon Maharashtra plant, with vendors contributing an additional ₹5,000 crore. This joint investment of ₹10,000 crore aims to boost the plant's capacity to 1,30,000 units annually. The investment
Tweet media one
Tweet media two
0
48
532
@Amarrrrz
🇮🇳 Amαr
10 months
Uttar Pradesh government plans to revolutionize Mahakumbh 2025, a religious event occurring every 12 years, by creating a sprawling 'Tent City' in Prayagraj, managed by UPSTDC. Project covers 25 hectares, designed for 2,000 guests in luxury villas & deluxe rooms, divided into 10
Tweet media one
Tweet media two
Tweet media three
Tweet media four
8
58
522
@Amarrrrz
🇮🇳 Amαr
11 months
India Middle East Europe Connectivity Corridor This Economic Corridor is a historic collaboration led by Bharat and the US. It involves cooperation on connectivity and infrastructure and includes India, UAE, Saudi Arabia, the EU, France, Italy, Germany, and the US. The corridor
Tweet media one
Tweet media two
Tweet media three
Tweet media four
13
96
437
@Amarrrrz
🇮🇳 Amαr
3 months
📍Delhi-Mumbai Expressway, Hilalpur section (NE4)
3
34
399
@Amarrrrz
🇮🇳 Amαr
2 months
Day & Night transitions mode, Mumbai 🇮🇳
5
42
403
@Amarrrrz
🇮🇳 Amαr
3 months
Megha Engineering and Infra Ltd teams are building a 1.2 KM bridge over the Tungabhadra River for the Surat-Solapur-Kurnool-Chennai Expressway.
9
39
382
@Amarrrrz
🇮🇳 Amαr
3 months
Footage of the Sukhoi Su-30 MKI during the IAF's touchdown exercise on the Lucknow-Agra Expressway. VC🎥 @Defencecore
4
29
371
@Amarrrrz
🇮🇳 Amαr
9 months
The Govt of Uttar Pradesh is focusing on the development of districts in the eastern region, Purvanchal, with projects worth ₹1,24,389 crore set to launch in 21 districts during an upcoming ground-breaking ceremony. 249 projects Gorakhpur ₹10,087 crore 130 Projects Prayagraj
Tweet media one
Tweet media two
Tweet media three
Tweet media four
4
47
366
@Amarrrrz
🇮🇳 Amαr
1 month
The Mumbai-Pune "missing link" project, now 85% complete, has its deadline extended to March 2025 due to execution challenges. This 13-km project, costing Rs 6,600 crore, includes viaducts, tunnels, and a cable-stayed bridge, aiming to reduce travel time by 20-30 minutes. 📷
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
38
367
@Amarrrrz
🇮🇳 Amαr
7 months
📍Shahpur Metro Station Ahmedabad, Gujarat
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
21
332
@Amarrrrz
🇮🇳 Amαr
1 year
J&K Government and #Tata Motors collaborate for an e-bus fleet project. Deal involves 200 eco-friendly, fully air-conditioned e-buses for sustainable transportation. The Govt pays Rs 55.62 per/km for 12-m long buses and Rs 47 per/km for 9-m long buses to Tata Motors. 100 e-buses
Tweet media one
Tweet media two
1
34
335
@Amarrrrz
🇮🇳 Amαr
3 months
📍Delhi Mumbai Expressway (Ahmedabad - Bharuch Section) Vadodara interchange at Dodka village, currently in its final construction phase.
1
37
330
@Amarrrrz
🇮🇳 Amαr
10 months
Nashik to become aircraft manufacturing hub with HAL's plant, production lines for indigenous LCA Mk-1A and HTT-40 planes in Nashik Expedited work to meet Indian Air Force's fighter jets and trainers requirements, Nashik line to produce 8 additional LCA Mk-1A, totaling 24 jets
Tweet media one
Tweet media two
Tweet media three
1
31
325
@Amarrrrz
🇮🇳 Amαr
19 days
The first train carrying railway construction materials reached Hortoki station in Mizoram under the Bairabi-Sairang New Line Project, marking a significant step towards better connectivity in the Northeast. The line will be commissioned soon, bringing Aizawl closer to being on
0
63
338
@Amarrrrz
🇮🇳 Amαr
2 months
📍Chandani Chowk flyover, Pune Maharashtra
5
48
301
@Amarrrrz
🇮🇳 Amαr
2 months
Mumbai Ahmedabad Bullet Train Corridor 📍Surat section, Gujarat Construction started in April 2020. The 352 km section through Gujarat is set to be fully operational by 2027, with the Surat to Bilimora stretch opening in August 2026. The remaining segment to Mumbai will be
2
33
283
@Amarrrrz
🇮🇳 Amαr
10 months
Mumbai cruise terminal, set for 2024, can handle 200 ships and one million passengers yearly, announced by CM Shinde at Maritime Summit. Maharashtra's maritime advantages highlighted, contributing to India's trade growth. Efforts to boost maritime tourism and industries
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
38
269
@Amarrrrz
🇮🇳 Amαr
2 months
The Jammu and Kashmir Police have installed an AI-based facial recognition system near the Banihal tunnel, enhancing their smart policing efforts. This system can accurately match faces with a database, even if masks are worn, and will be expanded throughout the UT.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
31
273
@Amarrrrz
🇮🇳 Amαr
8 days
The Dedicated Freight Corridor Corporation of India Ltd (DFCCIL) has submitted detailed project reports for new freight corridors to the Railway Board. These include the East Coast, East-West and North-South corridors, covering 4,300 km at a cost of ₹2,00,000 crore. The Japan
Tweet media one
Tweet media two
Tweet media three
Tweet media four
9
67
443
@Amarrrrz
🇮🇳 Amαr
2 months
Indian Railways will launch 50 additional Amrit Bharat Trains this year, aiming to develop trains that can travel at 250 kmph, with 1000 such trains planned in the future. Launched on Dec 30, 2023, the Amrit Bharat Trains run between Anand Vihar to Darbhanga and Bengaluru to
Tweet media one
Tweet media two
Tweet media three
6
21
264
@Amarrrrz
🇮🇳 Amαr
25 days
Alstom plans to manufacture large railway batteries in India within a year, starting at its Gujarat facility after European tests. The batteries can be used to move various railway systems such as Vande Bharat trains, metro rail and others.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
35
259
@Amarrrrz
🇮🇳 Amαr
3 months
The Delhi Mumbai Expressway and the bullet train line are intersecting each other, and both projects are progressing rapidly. It is hoped that the expressway work will be completed by Dec 2024, and the Gujarat section of the bullet train work will be completed by August 2026.
5
27
258
@Amarrrrz
🇮🇳 Amαr
10 months
PM Modi to inaugurate RAPIDX service on Delhi-Meerut RRTS Sahibabad-Duhai section on 20 October. 17 km priority section between Sahibabad and Duhai open to the public after inauguration, 25 KM more to be added in 6 months; stations at Muradnagar, Modinagar North, Modinagar
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
28
247
@Amarrrrz
🇮🇳 Amαr
5 months
Tomorrow 6 March, PM Modi will virtually inaugurate a 17 Km section of the Delhi Meerut RRTS, extending from Duhai to Modinagar South, marking the full operationalization of the 34 Km route within Ghaziabad. Additionally, the 8km Modinagar to Meerut South section is set to open
Tweet media one
Tweet media two
Tweet media three
Tweet media four
4
28
252
@Amarrrrz
🇮🇳 Amαr
2 months
Vizag city, Andhra Pradesh 🇮🇳 📍17°40'46"N 83°14'06"E
3
21
234
@Amarrrrz
🇮🇳 Amαr
9 months
Jindal Group donated 600 MT of High-quality stainless steel for Namo (Rapid) Bharat train project The steel will be used in constructing 66 new train coaches, enhancing their quality and durability Stainless steel's corrosion resistance and strength will extend the longevity of
Tweet media one
Tweet media two
5
20
217
@Amarrrrz
🇮🇳 Amαr
1 month
Indore Metro L1 is an under construction project to be completed in December 2024 📷 Vijay Nagar Metro Stasion
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
13
227
@Amarrrrz
🇮🇳 Amαr
3 months
Prayagraj Varanasi Rail line Doubling Project Rail Vikas Nigam Limited @RailVikas is constructing the second railway bridge over the Ganga, featuring 24 spans. The last girder was recently installed, and the entire track from Daraganj to Jhunsi is expected to be operational by
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
27
219
@Amarrrrz
🇮🇳 Amαr
2 months
RVNL Wins Bid for Nagpur Metro Construction of 6 elevated metro stations in Nagpur Metro Phase-II. Cantonment, Kamptee Police Station, Kamptee Municipal Council, Dragon Palace, Golf Club, Kanhan River Project Cost ₹187.34 crore Completion Time 30 months Part of RVNL's broader
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
31
217
@Amarrrrz
🇮🇳 Amαr
2 months
Alstom won a 96.2 million euros contract to supply a fully-automated CBTC signalling system for Bengaluru Metro Phase 2, covering 80.39 km. The project aims to halve travel time, reduce CO2 emissions, and include platform screen doors. Alstom's driverless CBTC Urbalis will be
Tweet media one
Tweet media two
Tweet media three
Tweet media four
5
20
215
@Amarrrrz
🇮🇳 Amαr
24 days
Tata Realty secured an ₹825 crore loan from IFC to refinance Ramanujan Intellion Park in Chennai, supporting its sustainability efforts. The park includes an SEZ and a hotel, with significant energy and water savings. Tata Realty, a Tata Sons subsidiary, has over 50 projects
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
15
218
@Amarrrrz
🇮🇳 Amαr
2 months
New 60 km Railway Line Proposal for Regional Connectivity (UP, Haryana) 🔴Project Cost and Timeline: ₹2,400 crore, 3 years to complete 🔴 Route: Chola, Bulandshahr to Rundhi, Palwal 🔴 Purpose: Link Noida International Airport to major routes (Howrah, Chennai, Mumbai) 🔴
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
25
209
@Amarrrrz
🇮🇳 Amαr
8 months
India secured two $250 million loans from the Asian Development Bank for infrastructure projects. One loan supports the National Industrial Corridor Development program, while the other funds the Delhi-Meerut RRTS corridor construction.
Tweet media one
Tweet media two
2
7
205
@Amarrrrz
🇮🇳 Amαr
2 months
A 21 km tunnel is being built for the Mumbai-Ahmedabad Bullet Train, with 16 km using TBMs and 5 km using NATM. For the TBM section, 76,940 segments forming 7,441 rings will be cast, using M70 grade concrete for durability. The casting yard in Mahape, Maharashtra, covers 98,898
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
23
210
@Amarrrrz
🇮🇳 Amαr
1 month
📍Mumbai Coastal Road, Maharashtra 🇮🇳
1
13
209
@Amarrrrz
🇮🇳 Amαr
1 month
Cabinet approves ₹2,869.65 crore for Varanasi airport development, includes new terminal, apron, runway extension and taxi track. Capacity increase: 3.9 MPPA to 9.9 MPPA New terminal: 75,000 sq meters, 6 MPPA, 5,000 PHP, apron for 20 aircraft PC - @TheMetroRailGuy
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
18
206
@Amarrrrz
🇮🇳 Amαr
1 month
Under Mission Raftaar, Mumbai-Ahmedabad Vande Bharat and Shatabdi trains are set to reach 160 kmph by August 15. The Railway Board has instructed the Mumbai and Vadodara divisions to complete necessary work by June 30, including confirmatory oscillograph car runs. The project
Tweet media one
Tweet media two
1
27
207
@Amarrrrz
🇮🇳 Amαr
3 months
📍Modi Nagar North RRTS
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
19
203
@Amarrrrz
🇮🇳 Amαr
4 months
Construction of Shinkula Tunnel, world's highest, begins in June @BROindia awards ₹1500 crore tender to Delhi company tunnel facilitates year-round army convoy movement on Manali-Darcha-Leh route. The 4 KM tunnel is set to finish construction by 2027, slashing travel time from
Tweet media one
Tweet media two
Tweet media three
Tweet media four
6
18
197
@Amarrrrz
🇮🇳 Amαr
26 days
📍Lodha Park Mumbai, Maharashtra 🇮🇳
1
20
200
@Amarrrrz
🇮🇳 Amαr
23 days
📍Mumbai-Ahmedabad Bullet Line, Elevated Section 📷 @RailMinIndia
Tweet media one
Tweet media two
0
9
191
@Amarrrrz
🇮🇳 Amαr
3 months
📍Delhi Meerut Expressway NE3 The Delhi-Meerut Expressway is a 96 KM long, controlled-access highway connecting Delhi with Meerut in Uttar Pradesh, India. It is designed to reduce travel time between the two cities significantly.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
16
188
@Amarrrrz
🇮🇳 Amαr
8 months
IndiGo launches its first flights to Ayodhya Airport, connecting Delhi and Ayodhya from January 6, daily operations using Airbus A320 aircraft start from January 10. Additionally, thrice-weekly flights between Ahmedabad and Ayodhya begin on January 11. These new routes mark
Tweet media one
Tweet media two
Tweet media three
Tweet media four
4
16
188
@Amarrrrz
🇮🇳 Amαr
25 days
By July 1, 2024, Indian Railways had electrified 96.43% (63,491 KM) of its broad gauge network (65,861 KM). The goal was to complete electrification by March 2025.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
20
184
@Amarrrrz
🇮🇳 Amαr
11 months
Maharashtra CM announces a ₹ 45,000 Cr development package for Marathwada region. The announcement was made during a Cabinet meeting held in Chhatrapati #Sambhajinagar on the 75th Marathwada Liberation Day, will benefit 8 districts in Marathwada. Additionally, ₹ 14,000 Cr has
Tweet media one
Tweet media two
4
15
182
@Amarrrrz
🇮🇳 Amαr
1 month
The Maharashtra Cabinet, led by CM @mieknathshinde , approved a direct payment of 1163 crores to the Mumbai Metro Rail Corporation for the Metro-3 project. The project, costing 37,275.50 crores, is 98.1% complete, with the first phase from Sipz to BKC set to start by September
1
27
184
@Amarrrrz
🇮🇳 Amαr
9 months
Tata Electronics acquires Wistron's Indian venture, becoming India's first iPhone maker. The deal, worth USD 125 million, includes the iPhone manufacturing plant near Bengaluru. This move aims to increase India's iPhone production, with a goal to shift 18-20% of global
Tweet media one
Tweet media two
Tweet media three
1
22
170
@Amarrrrz
🇮🇳 Amαr
5 months
Bharat plans to manufacture 1,000 new-generation Amrit Bharat trains capable of 250 kmph, with the potential for export within 5 years.
Tweet media one
Tweet media two
Tweet media three
Tweet media four
6
18
178
@Amarrrrz
🇮🇳 Amαr
10 months
BMC's Desalination Plant Project BMC is set to issue tenders for a desalination plant to address increasing water demand in Mumbai, #Maharashtra . Estimated cost is ₹13,028 Cr Phase 1 costing ₹5,625 Cr, 200 MTD capacity Phase 2 costing ₹7,404 Cr, 400 MTD capacity Project
Tweet media one
Tweet media two
Tweet media three
3
21
176
@Amarrrrz
🇮🇳 Amαr
28 days
The last 76 km stretch of the Mumbai Nagpur Samruddhi Mahamarg will be ready by the end of August and open in September, except for a 2 km bridge section, which will be completed by November. The highway will be fully operational before state assembly elections, boosting traffic
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
34
181
@Amarrrrz
🇮🇳 Amαr
2 months
Radisson Hotel Group, in partnership with Naturals Dairy, will open its first hotel in Bihar, Radisson Hotel Patna, by November 2027. Located in Patliputra, Patna, the hotel will have 120 rooms, ballrooms, a fitness area, a swimming pool and multiple dining options. This
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
21
180
@Amarrrrz
🇮🇳 Amαr
2 months
Kashi is set to launch India's first urban transport ropeway by Dev Diwali on November 15, easing traffic in Varanasi. The ropeway will link Varanasi Junction Cantt Railway Station to Rath Yatra, with equipment sourced from Switzerland and executed by Berthollet for Rs 8.07
Tweet media one
Tweet media two
Tweet media three
2
19
176
@Amarrrrz
🇮🇳 Amαr
1 year
The scheme aims to improve station amenities, access, circulating areas, waiting halls, toilets, lift and escalators, cleanliness, free Wi-Fi, and kiosks for local products, with an investment of Rs 20,000 Cr. Simultaneous events to be held at all 500 locations across the
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
14
178
@Amarrrrz
🇮🇳 Amαr
1 month
NCC won the bid for the Daudhan Dam under the Ken-Betwa Link Project, including EPC tasks for the dam, tunnels, and ancillary works. The project, valued at ₹3,389.49 crore, involves water transfer from the Ken to Betwa rivers, overseen by the Ken-Betwa Link Project Authority
Tweet media one
Tweet media two
Tweet media three
Tweet media four
0
18
176
@Amarrrrz
🇮🇳 Amαr
10 months
Air India commissioned mega warehouse in Delhi for aircraft spares, spread across 54,000 sq ft near Terminal 3 at Delhi Airport. Centralized facility improves flight turnaround time, one-stop solution for storing various aircraft spares, tools, and equipment. Integrates 16
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
14
168
@Amarrrrz
🇮🇳 Amαr
9 months
Railways plans to introduce 3,000 new trains within the next 4 to 5 years, aiming to increase passenger capacity from 800 crore to 1,000 crore. Aims to add 200 to 250 trains annually, in addition to 400 to 450 Vande Bharat trains. This initiative includes manufacturing
Tweet media one
Tweet media two
Tweet media three
3
14
165
@Amarrrrz
🇮🇳 Amαr
3 months
Progress on the Rishikesh-Karnaprayag rail line in Uttarakhand, spanning 125 KM, is well underway. 72.2% of the new broad gauge railway has been built, with the project slated for completion by the end of 2025. The project includes 17 tunnels, with one of the longest at 15.1 km,
Tweet media one
Tweet media two
Tweet media three
Tweet media four
1
15
163
@Amarrrrz
🇮🇳 Amαr
4 months
Western Railway plans to extend the harbour line from Goregaon to Borivli by 8 km in two phases to ease congestion in the Andheri-Borivli section. Completion target: 2027-28, tenders to be floated in May 2024, work to start mid-June. Phase 1: 2 km from Goregaon to Malad by
Tweet media one
Tweet media two
Tweet media three
Tweet media four
8
20
166
@Amarrrrz
🇮🇳 Amαr
2 months
Central Railway has issued a tender for major bridges, ROBs, and civil structures on Solapur-Tuljapur-Osmanabad rail line section in Maharashtra. The scope includes earthwork, bridges, ROBs, subways, retaining walls, drains, track laying, and various buildings. Contract
Tweet media one
Tweet media two
Tweet media three
Tweet media four
3
18
161
@Amarrrrz
🇮🇳 Amαr
7 months
Maharashtra Metro Rail issues a tender for Nagpur Metro Rail Project Phase-II, including a 17.624 KM Metro viaduct and a 1.027 KM double-decker road bridge. The project, within Reach-1A, spans from ch.21256.814 to ch.38881.7 and involves railway spans of 79 meters and 100
Tweet media one
Tweet media two
Tweet media three
Tweet media four
2
18
162